In accordance with the SBB standards and the technical fire protection technical fire protection requirements, we planned and implemented safety lighting for the evacuation and implemented safety lighting for evacuating people from the tunnel.
The handrails were mounted directly on the wall, standardised and tested in the event of a fire. The LaneLED GRP system was adapted to the existing signalling boxes using special brackets for the specific project. Socket distributors for maintenance as well as basic and maintenance lighting were also realised.